This trip was primarily to inspect the new water system, and meet with contractors.

The old spring-box next to the road, a little above the big old open tank was replaced with a new spring-box.

new springbox top
new springbox top
new springbox outflow
new springbox inflow
gutter above spring
from above spring to big tank
Dave Clayton, contractor
staked-out pad

Next way we met up with Mark and Rob, to finish the water line.

Mark unloading his 'dozer
end of new water-line
Rob and Nathan on new water-tank
patching the pipe
Rob, Nathan, Mark
crossing the ravine